Cold room supply and install - Doncaster
Sector: Hospitality | Contract: Supply and install
Airmaster have completed the supply and install of a cold room for Highfield Coffee Social in Doncaster as part of their fit out of their new coffee shop.
Main Contractor: Togel Contractors
Project Manager: Stephanie Lagan–Collins, Fatfish Design
Airmaster supplied and installed the walk-in chiller cold room, refrigeration equipment, cold room shelving and a personnel entrapment alarm.
We also supplied and installed a stainless-steel kitchen canopy with integrated supply and extract, along with stainless steel wall cladding.
The existing A/C fan coil units were relocated, and we supplied and installed additional heat recovery units, along with upgrading all the ceiling grilles to matte black to fit with the new interior decor of the public facing coffee shop space.
To download a full copy of our case study please click here
“We have worked with Airmaster for around 20 years for all our air conditioning requirements throughout our business sites in Doncaster, including PPM, servicing, server room design and install when relocating offices.
When we have had problems arise in the past, all it has taken is a phone call to Airmaster, and on many occasions they have gone the extra mile to help us resolve the issue quickly and efficiently.
So, when we began to develop plans for Highfield Coffee Social, we knew we were in capable hands with the team to fulfil our specific requirements. The whole process, from initial plans through to fit and commission, was faultless, and we are delighted with the outcome.”
Mike Stark, Facilities Manager, Highfield